SDS has worked in irrigation, river training, environment, disaster prevention, building, road and capacity building, covering feasibility study, survey, design, estimation, report preparation, impact assessment, water supply works, technical audit, training and environmental studies.
| Sector | Assignments | Remarks |
|---|---|---|
| Irrigation | 36 | Includes feasibility study, design, implementation, operation and maintenance and environmental study |
| River training and disaster prevention | 8 | Design estimation, Cost, Economical Analysis, Sensitivity Analysis, impact study and technical audit |
| Water Supply and Sewerage Management | 9 | Technical Survey, Design, BQ, Cost Estimation |
| Building | 3 | Technical audit. IEE |
| Road | 3 | Technical audit, IEE |
| Capacity building | 3 | Training and training manual preparation |
| Total | 62 |
Authorized Capital: 10,000 ('000)
Issued Capital: 3,000 ('000)
Paid-up Capital: 2,954 ('000)
2081-082: 835,000.00
2080-081: 4,706,970.25
2079-080: 9,576,578.61
2078-079: 3,768,380.50
2077-078: 3,945,768.00
2076-077: 1,519,321.25
2075-076: 3,687,141.50
Total: 28,039,160.11
Average: 4,005,594.30
Average of Best 3 yrs.: 6,076,438.95
Kathmandu–31, Mid-Baneshwor, Kathmandu, Devkota Sadak, about one kilometre from Birendra Convention Hall of New Baneshwor.
Office space: 1,430 sq.ft.
The detailed experience register contains the source's project numbers, clients, coverage, contract amounts and completion periods.
Open detailed project register